Friday, August 26, 2005

Roadworks

Finally, just as the road surface near Kingston was about to slide downhill in chunks completely, to the extent that it had had emergency tarring slathered over it, the road has been rebuilt completely. With weeks elapsing since small areas had been marked by paint, my fear was that it would just have been another set of cosmetic patches that would soon fray around the edges.

Meanwhile, at some point over the summer, a chunk of asphalt has been applied to reduce the worst of the steps in the cycleway over the M11, but there's still no sign of any real work going to be done ever.

No comments :